Substation with disconnectors and power transformers

We unblock your grid connection from 10 to 380 kV, so your project can move forward.


Invite us for Operation Insight

One half-day at your office · €250 excl. VAT

  • Insight, where there is uncertainty today
  • Predictability instead of delays
  • Control back, with you and your steering committee
TenneT Liander Haskoning Digital Realty Hanab Sif

Three steps, one point of contact. You stay in control.

Start free with nine questions. Then put the coffee on and we come by for a half-day. If the whole energy project needs a full review, we do that too. At every step you talk to the same people, and we translate the engineering into something you can decide on.

Insight, where there is uncertainty today

Business park with a high-voltage pylon in the background

The Grid Connection
Quickscan

Nine questions, two minutes. You see what every month of waiting costs you and which route is still open. One page, ready to take to your next meeting.

Free · 10–380 kV · 2 minutes

Start the quickscan

Predictability instead of delays

Two cups of coffee on a table by the window

Operation Insight

One half-day at your office. You provide the coffee.

You invite us, we come as a pair. For one half-day we look at your energy project: what you have applied for, what the grid operator has promised, and where the two do not match. You provide the coffee.

Afterwards you know where it is stuck, how long it will really take and what needs to happen first. Enough to put a decision to your steering committee. Not another status update.

€250 excl. VAT · one half-day

Invite us

Control back, with you and your steering committee

Business premises with solar panels on the roof

Operation Control

We go through the whole energy project and check the numbers. You get a schedule that holds, the risks on the table with a price attached, and one document your steering committee can say yes or no to.

And you have just one point of contact. We talk to the grid operator, the municipality and the contractors. You don't have to.

Fixed fee up front · 6 to 10 weeks · after Operation Insight

See Operation Control

What we ultimately sell is one decision.

Not a report, not a team on hourly rates. One dossier your steering committee can say yes or no to in a single session. The risks are dealt with, and underneath sits a route to the connection that puts engineering, permits and lead times on one schedule.

  1. Analyse

    Power demand and profile, grid situation and congestion position, the contract forms still open (firm, flexible, cable pooling, closed distribution system), the technical variants with their lead times and cost estimate, and the permit and land position. Tested with the parties that will have to approve it later.

    Delivers: one truth about what is possible, and a decision document your steering committee can say yes or no to.

  2. Mobilise

    The right parties at the table and committed at the right moment: TSO, DSO, municipality, province, contractors. Who does what, when, and which decisions your steering committee must take at which moment, so that nobody is waiting on anybody.

    Delivers: a route in which every party finds its own role.

  3. Direct

    Owner’s engineering and QA/QC, guarding the long lead equipment, and walking the gates until the connection is in place. Per gate: what must be ready, who decides, and what happens if it is not ready.

    Delivers: a schedule that does not shift without you knowing why.

Operation Control is the analysis. Running the project afterwards, getting every party moving and keeping them on track, is a separate engagement, and only if you want it. You are under no obligation.

Decision document Example · steering committee

Operation Control

Grid connection under control.
Main project back on track.

Data centre, Zuid-Holland · 40 MW · 150 kV

Critical path

Grid connection
150 kV, grid operator
Main project
development and construction

18 months at a standstill. The building is finished. The power isn't.

confirmed not yet confirmed blockage milestone

Risk inventory · top 3

Transport capacity unconfirmed HH Grid operator confirmation before the investment decision
Transformer lead time MH Lock in the production slot and order date
Permit not aligned MM Agree the pre-application talks with the permitting authority and fix the submission date

Conditional go

Release once transport capacity is confirmed and the transformer delivery date is secured.

DecisionConnection investment
OwnerSteering committee
No later thanend of Q1

Insight into your grid connection within five working days.

Pick a half-day. We come to you, go through everything and set down within five working days what is right, what is missing and what needs to happen first. No six-week quotation process: from that moment on, it moves.

This week

You pick a half-day

No quotation, no proposal up front. You tell us when it suits you and who joins from your side. These are the next available half-days:

One half-day at your office · €250 excl. VAT · coffee on you

The half-day itself

We come to you

Two of us at the table, chosen for where the project is stuck. We look at what has been applied for, what has been committed, and what doesn't add up.

There are four of us, and we come ourselves. No junior with a questionnaire. More about us

Within five working days

You have the dossier

Ready to put on the table at your next steering committee.

Decision document Conditional go This is what it looks like
  • A schedule with the long lead times built in
  • Risks named, weighed and assigned an owner
  • The advice: go, no-go, or what has to happen first

Work where it counts.

Not the projects that look good on a website, but the ones where the grid connection really was the problem.

AmpHytrite offshore hydrogen AmpHytriteOffshore green hydrogen without a grid connection. From feasibility to contracting, offshore wind energy converted into hydrogen.
150 kV Oosterhout 150 kV OosterhoutNew TenneT and Liander substation near Nijmegen. Room for growing demand and renewable generation, built energy-neutral.
Rozenburg-Zuid 150 kV GIS substation Rozenburg-Zuid 150 kVNew GIS substation with 30 bays for additional grid capacity in the Haarlemmermeer. Ready for the growth of housing, business and the energy transition.
In a world of AI and Teams calls, we believe in something old-fashioned: the person behind the email. A conversation in which someone says what they really need, and the other listens. That is where power starts to flow, between generation and offtake, between plan and execution, between people who would otherwise work past each other. Connection is not a soft skill. It is the whole point.

Power begins with connection

Willem Bonnes

One half-day with a founder

Directly with Willem or Egbert; together we are NexON. We come by, look at what is stuck and show it to you in black and white, even if we turn out not to be the right party.

One half-day at your office · € 250 and two good cups of coffee